Assignment 4: Performing
Effective Project Monitoring and Risk Management
Imagine
that you are employed as an IT project manager by a prestigious coffeemaker
organization. This organization operates many coffee shops within the region
and would like to promote its brand by creating a mobile application that will
provide its customers with the ability to view the nearest coffee shop location
within their geographical area.
As
a member of the software development team, you estimate a total project cost of
$150,000. You have designated control points to measure project progress. At
control point 2, the following data is available:
|
Budget
Cost of Work Performed
|
$
24,000
|
|
Actual
Cost of Work Performed
|
$
27,500
|
There
are various stakeholders that are interested in the progress of the project.
These stakeholders include the marketing management team (internal customers),
software designers, programmers, testers, and upper management. The software
development team has attempted to release a mobile application of this
magnitude in the past; however, lack of sponsorship, mobile development
expertise, and technical infrastructure has limited the team’s success.
Write
a four to six (4-6) page paper in which you:
- Identify at
least four (4) attributes of the mobile application development project
that can be measured and controlled and evaluate how each is a critical
factor for the success of the project.
- Generate a
project plan summary of the various project milestones. Develop a WBS that
details work packages required to complete project scope.
- Develop a
workflow model that can be used to inspect and detect defects during the
acceptance of this mobile product through the use of graphical tools in Microsoft
Word or Visio, or an open source alternative such as Dia. Note: The graphically depicted
solution is not included in the required page length.
- Describe
how the defects detected during the acceptance of the mobile application
should be reported and explain the circumstances in which a defect may not
require reporting.
- Analyze the
communication needs of the different project stakeholders. Explain the
types of project status reports that would be useful to each.
- Compute the
cost variance, schedule variance, cost performance index, schedule
performance index, and estimated actual cost using the information
presented at control point 2. Interpret the project schedule and budget
status from the calculations.
- Explain how
work package, binary tracking, and earned valued reporting can be used
effectively during the maintenance phase of the software life cycle if
various change requests may be assigned to individuals and processed on an
individual basis.
- Develop a
risk register that will document all of the estimated risks. Assign one
(1) risk management technique for each risk and explain the basis for your
selection.
- Use at
least three (3) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality
resources.
Your
assignment must follow these formatting requirements:
- Be typed,
double spaced, using Times New Roman font (size 12), with one-inch margins
on all sides; citations and references must follow APA or school-specific
format. Check with your professor for any additional instructions.
- Include a
cover page containing the title of the assignment, the student’s name, the
professor’s name, the course title, and the date. The cover page and the
reference page are not included in the required assignment page length.
- Include
charts or diagrams created in Visio or Dia. The completed diagrams /
charts must be imported into the Word document before the paper is
submitted.